Description

PLAXIS Designer is a 3D conceptual model builder used to significantly reduce model creation times by visualizing, optimizing, and merging engineered earth structures, staged construction and excavation, topology, borehole, piezometer, and field instrumentation geotechnical data into a well-defined design model for subsequent numerical analysis. Use data from OpenGround and numerous other sources and input formats. Analyze designs with PLAXIS 3D LE, PLAXIS 2D LE, and PLAXIS 2D.

Capabilities

  • Calculate material volumes
  • Create construction sequences
  • Create models quickly
  • Create stunning client visuals
  • Edit geometry
  • Export to numerical modeling modules
  • Generate depositional surfaces
  • Import boreholes
  • Import multiple file types
  • Integrate field data
  • Intersect surfaces
  • Make surface cuts
  • Represent complex 3D surfaces

Specifications

Licence:
Commercial
Provider:
Bentley Systems
Platforms:
Desktop - Windows 7, Desktop - Windows 8, Desktop - Windows 10

Tags

conceptual modeling stress deformation calculate volumes depositional surfaces piezometric data SVDESIGNER import boreholes groundwater model piezometer 3D visualization Visualization Modeling groundwater Plaxis modelling plaxis designer Consolidation Slope stability

Videos